Case study 06 / Logistics
Intelligent Supply Chain
A shared data layer across orders, fleet telemetry and warehouse events that powers demand forecasting and exception management.
Illustrative reference architecture, not a client engagement. Outcomes described here are design goals, not measured results.
Reference flow
05 stages
01Challenge
Why this problem is hard.
01
Disconnected systems
ERP, WMS, TMS and telematics each hold part of the picture, with different identifiers for the same shipment.
02
Batch latency
Nightly extracts mean decisions are made on yesterday's state.
03
Reactive exceptions
Problems surface late, when fewer recovery options remain.
04
Forecasts without context
Demand forecasts ignore operational signals such as stock positions, promotions or lane disruptions.
02Business context
Assumptions and constraints.
Constraints the design must respect
- 01Integrate, don't replace
- Core platforms stay. The data layer works with their APIs and change feeds.
- 02Variable partner data
- Carrier and partner data arrives in mixed formats and quality, and is validated at the platform edge.
- 03Planner control
- Optimization proposes and planners approve. Automation is limited to well-understood, reversible cases.
- 04Cost discipline
- Telemetry volumes can be large. Retention and aggregation are designed deliberately.
03Architecture
Reference architecture.
Order, inventory and shipment changes come from ERP, WMS and TMS through change data capture or APIs. Fleet telematics and scanner events arrive as device streams.
- Change data capture
- Partner APIs and EDI
- Telematics streams
- Scanner events
Concept architecture
01 / 06
Orders & IoT sources
Order, inventory and shipment changes come from ERP, WMS and TMS through change data capture or APIs. Fleet telematics and scanner events arrive as device streams.
- Change data capture
- Partner APIs and EDI
- Telematics streams
- Scanner events
Key patterns
- Canonical business events
- Identity resolution
- Probabilistic forecasting
- Exception routing
04Technology
Representative technology.
01
04 items
Integration
- Change data capture
- API gateway
- EDI translation
- Device telemetry ingestion
02
04 items
Data platform
- Kafka-compatible event streaming
- Lakehouse with open table format
- Low-latency state store
- Data contracts and lineage
03
04 items
Analytics & ML
- Forecasting models
- Optimization solvers
- ETA prediction
- Backtesting framework
04
04 items
Applications
- Planner workbench
- Exception queue
- Notifications
- Role-based access control
05Engineering approach
Principles behind the design.
- 01
Events as the shared language
A canonical event model gives every team the same view of an order's state, whatever the source system.
- 02
Current state and history
Operations need the latest state in seconds; forecasting needs complete history. Both are served from the same events.
- 03
Uncertainty made visible
Forecasts and ETAs come with ranges, so planners judge risk instead of trusting a single number.
- 04
Automation by exception
Routine cases flow through. People focus on exceptions, with clear ownership and recovery options.
06Implementation
A phased delivery path.
Delivery path
04 phases
- 01Event model & sources
- 02Visibility
- 03Exceptions
- 04Forecasting & optimization
- Phase 0101
Event model & sources
Define canonical events and identifiers, then connect the first sources with change data capture.
Deliverables
- Canonical event model
- Source connectors
- Identity resolution rules
- Data contracts
- Phase 0202
Visibility
Current-state views of orders and shipments across systems, with data quality monitoring.
Deliverables
- Current-state store
- Visibility views
- Data quality checks
- Lineage
- Phase 0303
Exceptions
Detect and route at-risk orders with rules first, then ETA models as history accumulates.
Deliverables
- Exception rules
- ETA model
- Exception queue
- Recovery playbooks
- Phase 0404
Forecasting & optimization
Introduce forecasting and optimization for selected decisions, backtested against history before planners rely on them.
Deliverables
- Forecast models
- Backtests
- Optimization pilots
- Planner workbench
07Intended outcomes
Design goals, not results.
Design goal 01Intended
One operational picture
Orders, inventory and transport share an event model and identity, so teams work from the same facts.
Design goal 02Intended
Earlier exception detection
At-risk orders become visible while recovery options still exist.
Design goal 03Intended
Honest uncertainty
Planners see forecast ranges and their drivers, not single numbers presented as certain.
Design goal 04Intended
Integration without replacement
Existing ERP, WMS and TMS platforms stay in place; the data layer connects them.
No figures are attached to these goals. Actual results depend on the environment, data and delivery, and would be measured against baselines agreed at the start of a real engagement.
08Lessons & risks
Engineering lessons and risks to manage.
Risk 01
Identity resolution is the foundation
Matching the same shipment across systems is unglamorous and decisive. Budget time for it.
Risk 02
Partner data quality varies
Validate at ingestion and show quality per source, or poor feeds will quietly distort forecasts.
Risk 03
Optimization needs real constraints
A solver that ignores dock capacity or driver hours produces plans nobody can run.
Risk 04
Start with exceptions
Exception management delivers usable value from visibility alone, before forecasting models mature.
Start an engineering conversation
Facing a similar engineering problem?
Bring us the problem and the constraints around it. We'll help architect the system.